Well, the new air conditioner finally got the humidity down low enough and the builders were able to install the hard surface flooring today. They installed vinyl in the kitchen and bathrooms and tile in the master bath.
Sometime today the well drillers showed up and put in the well.
The tile in the master bath:
The entryway with the hard flooring installed:
And the electricians stopped in today and put some switch and receptacle covers on and installed the lights in the basement! We walked down to the basement with the flashlight and were pleasantly surprised when we flipped the switches and all the lights came on!